← Imperial Products / Tools / Concrete Calculator

Concrete Calculator

How much concrete do you need? Enter your dimensions and get an instant answer — cubic yards, cubic meters, bag counts, and estimated cost included.

Pour Details
ft
ft
in
Depth in inches (standard driveways: 4–6 in, structural slabs: 6–8 in)
ft
in
Depth in inches
in
Diameter in inches (e.g. 12 in = 1 ft post hole)
ft
ft
in per step
in per step
Typical: 7 in rise, 11 in run

Adding 10% overage is standard practice to account for spillage, uneven sub-base, and depth variations.
Concrete Needed
— cu yd
Calculation Breakdown
Volume (exact) —
Waste factor applied —
Total volume with waste —
Cubic yards needed —
Cubic meters needed —

Bag Counts
80 lb bags (0.60 cu ft each) —
60 lb bags (0.45 cu ft each) —
40 lb bags (0.30 cu ft each) —

Cost Estimator
Enter your price per cubic yard (ready-mix) or per bag:
$ per cu yd
Estimated ready-mix cost —

How to Calculate How Much Concrete You Need

Calculating concrete volume comes down to one core principle: length × width × depth (or thickness) gives you cubic feet. Convert that to cubic yards by dividing by 27, since there are 27 cubic feet in one cubic yard. Always add 5–10% overage to account for an uneven sub-base, spillage, and the inevitable small miscalculations.

The Formulas

Slab / Rectangle:
  Volume (cu ft) = Length (ft) × Width (ft) × Depth (ft)
  Depth (ft) = Depth (in) ÷ 12

Circular Slab:
  Volume (cu ft) = π × (Diameter / 2)² × Depth (ft)

Column / Cylinder:
  Volume (cu ft) = π × (Diameter (ft) / 2)² × Height (ft) × Count

Steps / Stairs:
  Volume per step (cu ft) = 0.5 × Rise (ft) × Run (ft) × Width (ft)
  Total = Volume per step × Number of steps × Number of steps avg factor

Cubic yards = Volume (cu ft) ÷ 27
Cubic meters = Cubic yards × 0.764555
80 lb bags = ceil(Volume (cu ft) ÷ 0.60)
60 lb bags = ceil(Volume (cu ft) ÷ 0.45)

How Concrete Is Measured

In the United States, concrete is ordered and priced by the cubic yard (cu yd). One cubic yard equals 27 cubic feet. Ready-mix trucks typically carry 9–10 cubic yards per load, and most suppliers have a minimum order of around 1 cubic yard. For small projects under roughly 0.5 cubic yards, pre-mixed bagged concrete is usually more practical and cost-effective.

In metric countries, concrete is sold by the cubic meter (m³). One cubic yard equals approximately 0.765 cubic meters, and one cubic meter equals approximately 1.308 cubic yards.

Standard Concrete Depths by Project Type

Project Type Recommended Depth Notes
Sidewalk / footpath 4 in (100 mm) Pedestrian traffic only
Residential driveway 4–6 in (100–150 mm) 4 in for cars, 6 in for trucks or heavy loads
Garage floor 4–6 in (100–150 mm) 4 in minimum; 6 in if heavy vehicles or equipment
Patio / outdoor slab 4 in (100 mm) Adequate for furniture and foot traffic
Structural / building slab 6–8 in (150–200 mm) Check local building codes; rebar typically required
Fence / deck post holes Below frost line Diameter typically 3× post width; depth per local frost depth

Concrete Mixing Ratios

Standard general-purpose concrete uses a 1:2:3 mix ratio by volume: 1 part cement, 2 parts sand, 3 parts aggregate (gravel). This yields a mix with a compressive strength of approximately 3,000 PSI (20 MPa) once cured — suitable for most residential flatwork including driveways, sidewalks, and patios.

For stronger structural applications (footings, columns, beams), a richer 1:1.5:3 mix or a specified design mix from a ready-mix supplier is typically required. Always follow your local building code and consult an engineer for load-bearing structural pours.

Concrete Curing Tips

Curing is the process of keeping concrete moist and at the right temperature so the cement hydration reaction can complete properly. Poorly cured concrete can lose up to 50% of its potential strength. The standard minimum curing period for residential concrete is 7 days, with full strength reached at 28 days.

When to Order Ready-Mix vs. Use Bags

The crossover point where ready-mix concrete becomes more economical and practical than mixing bags is roughly 0.5 to 1 cubic yard. The table below gives a practical guide:

Volume Best Option Reason
Under 0.5 cu yd (<45 bags) Bagged concrete Easy to handle; no truck minimum; no scheduling needed
0.5–1 cu yd (45–90 bags) Either; bags may be easier Ready-mix minimums may apply; bags give flexible timing
1–3 cu yd Ready-mix preferred Mixing 90+ bags by hand is impractical; rent a mixer
Over 3 cu yd Ready-mix (truck delivery) Most cost-effective; consistent mix quality; faster pour

When ordering ready-mix, specify the PSI strength (3,000 or 4,000 PSI for most residential work), the slump (how fluid the mix is — 4–5 inch slump is typical for general work), and any admixtures such as accelerators for cold weather or retarders for hot weather pours.

How Many Bags of Concrete Do I Need?

Bagged concrete comes in 80 lb, 60 lb, and 40 lb sizes. The coverage per bag is standardized by volume of concrete produced:

Because bags come in whole units, always round up to the nearest whole bag. It is far better to have one spare bag than to run short mid-pour. Unopened bags can often be returned; partially used bags harden over time and must be discarded.

More Free Online Tools

Ready to Start Your Project?

Get free, no-obligation quotes from licensed contractors in your area. Compare prices and save up to 30%.

Get Free Quotes Find Local Pros

Free service. No credit card required. Licensed & insured contractors only.

Get Your Estimate Emailed
Save your calculation results and get helpful project tips.
Thanks! Check your inbox for your estimate.
We respect your privacy. Unsubscribe anytime.
Download Professional PDF Report
Get a detailed project report with material lists, cost breakdown, and pro tips. Enter your email to download.
Your report is downloading!
Free professional report. We respect your privacy.

Ready to Start Your Project?

Get free, no-obligation estimates from licensed contractors in your area.

Get Free Estimates
✓ Free, no obligation ✓ Licensed contractors ✓ Your info stays private

Frequently Asked Questions

How many bags of concrete do I need for a 10x10 slab?

A 10x10 foot slab at 4 inches thick requires 1.23 cubic yards of concrete. That's about 56 bags of 80 lb concrete mix (each bag yields about 0.6 cubic feet). For larger projects, ordering ready-mix concrete is more cost-effective.

How thick should a concrete slab be?

A standard residential concrete slab is 4 inches thick. Driveways should be 5-6 inches. Garage floors are typically 6 inches. Heavy equipment areas may need 8 inches or more. Always place concrete on a compacted gravel base.

How much does concrete cost per cubic yard?

Ready-mix concrete costs $125-$175 per cubic yard delivered in 2026. Bagged concrete (80 lb bags) costs about $5-7 per bag, which works out to roughly $275-$380 per cubic yard. Ready-mix is cheaper for projects over 1 cubic yard.

Recommended Concrete Supplies on Amazon

Materials for your concrete project

As an Amazon Associate, we earn from qualifying purchases. This helps keep our tools free.

Related Content