How much siding do you need? Enter your wall dimensions, gable ends, and openings to get squares of siding, starter strip, J-channel, corner posts, and estimated cost.
Wall Dimensions
Width (ft)
Height (ft)
feet
feet
Each gable = 0.5 × base × height. The count above multiplies this.
qty
Each standard window ~15 sq ft (3 × 5 ft) is deducted.
qty
Each standard door ~21 sq ft (3 × 7 ft) is deducted.
Siding is sold by the "square" — 100 square feet of coverage. To find how many squares you need, measure the gross area of every wall, add gable end triangles, subtract window and door openings, then multiply by a waste factor (typically 10–20%) to account for cuts, overlaps, and waste around openings.
The Formula
Wall area (sq ft) = Width (ft) × Height (ft) per wall
Gable area (sq ft) = 0.5 × Base (ft) × Height (ft) per gable
Deductions = Windows × 15 sq ft + Doors × 21 sq ft
Net area = Gross wall area + Gable area − Deductions
Order area = Net area × Waste factor
Squares = Order area ÷ 100
What Is a Square of Siding?
One "square" of siding equals 100 square feet of coverage. Siding panels, cartons, and bundles are sized so that a known number of them covers one square. Always confirm with your supplier how many square feet per carton your specific product covers before purchasing.
Siding Types Comparison
Type
Lifespan
Material Cost
Maintenance
Best For
Vinyl
20–40 yrs
$70–$200/sq
Very low
Budget-friendly, easy DIY
Fiber Cement (HardiePlank)
30–50 yrs
$150–$400/sq
Low (repaint every 15 yrs)
Fire-resistant, durable
Wood Lap
20–30 yrs
$200–$500/sq
High (paint every 5–8 yrs)
Traditional aesthetic
Engineered Wood (LP SmartSide)
25–40 yrs
$120–$300/sq
Low–moderate
Wood look, better moisture resistance
Trim and Accessories
Beyond the siding panels themselves, a complete installation requires several accessories:
Starter strip: Runs along the bottom of the first course to properly angle it out from the wall. You need enough linear footage to cover the entire bottom perimeter.
J-channel: Frames around windows and doors (and under soffits for vinyl). Calculate 2 × height + 2 × width for each opening, plus perimeter at top and bottom.
Corner posts: Applied at every outside corner, running from bottom to top of the wall. Measure wall height at each corner.
Utility trim / F-channel: Used at the top of siding under soffit overhangs.
Nails/fasteners: Approximately 1 lb of 1.75-inch aluminum nails per square for vinyl; corrosion-resistant screws for fiber cement.
Waste Factor Guidance
10%: Simple rectangular walls with few openings. Very straightforward layout.
15%: Standard recommendation for most homes. Accounts for typical cuts and fitting.
20%+: Complex facades with dormers, angles, multiple gable ends, or many window/door openings requiring intricate cuts.
Tips for a Successful Siding Installation
Install house wrap first. A moisture barrier under siding protects the sheathing and dramatically extends siding life.
Check for level and plumb every few courses. Small errors compound quickly over a full wall height.
Leave a 1/4-inch expansion gap at joints for vinyl siding. Vinyl expands and contracts with temperature. A tight fit causes buckling.
Do not face-nail vinyl. It should hang freely from nailed slots to allow expansion. Drive nails in the center of slots.
Fiber cement requires primed and painted edges before installation to prevent moisture infiltration at cuts.
Stagger end joints at least 16 inches between rows to prevent water tracking down vertical seams.